Has This New AMI Equipment Been Tested for Accuracy and Reliability?

Yes. All upgraded meters have been tested and guaranteed accurate by the manufacturer, Mueller Systems, in compliance with American Water Works Association (AWWA) accuracy standards. Additionally, the design of the installation process includes a testing phase, which allows a subset of the meters to be installed and the billing software to be integrated, so the entire process, from the meter to the bill, will be tested and verified for accuracy prior to system-wide installation.