Solid Waste Pickup Update: 
The following streets and address will move to Tuesdays Trash Route Effective Monday 9/1/25.
  •  100-817 N Main St
  • Park Circle
  • 188-211 W Third St
  • Hemlock Ln
  • N Church St
  • W Second St
  • Poplar St
 
 

How long will I be without water during installation?

While replacement times will vary, replacing a meter should take no longer than 10 minutes for residential meters, during which the water will be shut-off for a portion of that time. The installation crews will make every effort to keep the interruption to your service to a minimum. Commercial and industrial customers will be contacted in advance to schedule installation to minimize the disruption to their business. After the new meter has been installed, a door tag will be placed on the front door notifying customers the work has been completed.

Close window