Search results

844 Results Found

Each radio frequency device has a unique identification number, which is transmitted along with the meter reading. The unique number is compared to your account record electronically to ensure a match.

Please, keep access to the water meter available at all times to ensure it is accessible for any potential emergency that would require the meter to be turned off. Be careful during the fall foliage season not to cover your water meter with piles of leaves.

No. Access needs to be available at all times. There will still be instances when meter technicians will visit the meter on site to perform routine maintenance or verify high readings. Obstructions to the meter box are subject to removal by City personnel.

Possibly but in most cases No. Older mechanical meters tend to lose accuracy as they age and, therefore, may not accurately measure all the water being used. The new water meter will accurately measure the water that you use. All new meters are tested prior to delivery by the manufacturer to ensure that they register...

Yes. All upgraded meters have been tested and guaranteed accurate by the manufacturer, Mueller Systems, in compliance with American Water Works Association (AWWA) accuracy standards. Additionally, the design of the installation process includes a testing phase, which allows a subset of the meters to be installed and the billing software to be integrated, so the...

If you have a leak, low pressure, or some other problem after the installation, or at any other time, you will be provided contact numbers that you can call to report your concern. Because your water will be turned off temporarily during the meter change process, you may experience a brief period of air or...

Date and time: Date and time: 2022-08-17 04:00 pmLocation: Lowell City HallDepartment: City Council Special Meeting: March 24, 2021Date and time: 2021-03-24 04:00 pmLocation: Lowell City HallDepartment: City Council Special Meeting: March 24, 2021

No. Since the water meters are located outside of the home in the City right-of-way, you will not need to be home for the replacement work; however, if your water meter happens to be accessed from your back yard, we can make arrangements to schedule this work if needed. A door hanger will be placed...

The City plans to develop an application for your smartphone or computer that will provide real-time data to the customer about their water usage. When this is developed, water customers will have the ability to access their daily water consumption online in one-hour increments. The City intends to do a public awareness notice and publish...

No, the City pays for the costs of the meters and their installation through existing utility fees. The City has prepared for the cost of this project as part of its annual capital improvement planning process. This project does not have any impacts to the existing water and sewer rates for the City.

No. The AMI system is a budget neutral project and included in the current utility rates.

To upgrade the meter to one capable of communicating with the AMI equipment, and as an extension of an existing program to replace aging meters after they have reached the end of their life cycle. With the introduction of newer technology, the existing meters are not able to communicate using the AMI technology. The newer...

All of the City’s meters will be replaced with new smart meters over a period of time.

• Improved customer service by increasing accuracy and frequency of meter readings. • Minimized need to access meters at the property. • Allows us to detect possible leaks daily and alert the customer immediately which can potentially save the customer from a high bill by having a leak go undetected for a month like the...

Date and time: Date and time: 2021-03-24 01:00 pmLocation: Lowell City HallDepartment: City Council Work Session Meeting: March 24, 2021

Advanced meter systems are quickly becoming the standard for utilities around the country. These new devices allow for more accurate and faster collection of water usage readings than the current manual method and improve safety conditions for City staff. Currently, the meter readers must open every meter box to obtain a reading from the meter....

The City of Lowell has chosen a fixed based network that provides two-way communication from the meter box to strategically located Base Stations. The City is replacing water meters throughout Lowell with new meters equipped with a meter transceiver. The meter transceiver is used to collect and transmit meter reading data, unique identification numbers, operating...

AMI stands for Advanced Metering Infrastructure. It is a method of using communication technology to read meters remotely without having to access the meter located in meter boxes in the ground.

Date and time: Date and time: 2021-04-20 01:15 pmLocation: Lowell City HallDepartment: City Council Work Session Meeting: April 20, 2021

Date and time: Date and time: 2021-04-20 01:00 pmLocation: Lowell City HallDepartment: City Council Special Meeting: April 20, 2021

Close window